<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="/afhi.xsl"?>
<dbo_IRIS_RECORDS>
 <IRISNUM>00916600</IRISNUM>
 <OLDACC>3-66609</OLDACC>
 <CLASS>UNCLASSIFIED</CLASS>
 <G_BEG_DATE>2440769</G_BEG_DATE>
 <BEG_DATE>07-01-1970</BEG_DATE>
 <G_END_DATE>2441133</G_END_DATE>
 <END_DATE>06-30-1971</END_DATE>
 <MAIN>WARNER ROBINS AIR MATERIEL AREA</MAIN>
 <RECTYPE>HISTORY</RECTYPE>
 <CALL>K205.14-40 V.1 PT.4</CALL>
 <TITLE_XT>VOL 1 PART 4</TITLE_XT>
 <ACCNOTES>REF 00916597</ACCNOTES>
 <REEL>25906</REEL>
 <FRAME>1463</FRAME>
 <FRAMELST>1745</FRAMELST>
 <INDEXID>20</INDEXID>
 <G_REL_DATE>2447945</G_REL_DATE>
 <REL_DATE>02-22-1990</REL_DATE>
 <ABSTRACT>CHAPTER 1 DETAILS THE BACKGROUND RELATED TO VARIOUS CONFIGURATIONS OF THE MODIFICATION OF THE TRANSPORT AIRCRAFT AS THE PROJECT MOVED TO A FINAL FORM  AS THE AC-130E AIRCRAFT GUNSHIP, PAVE SPECTRE; CHAPTER II LOOKS AT THE MODIFICATION PROGRAM AS TO THE SELECTION OF THE &apos;E&apos; MODEL AIRFRAME, GEN BECK&apos;S  PURSUIT OF THE AIR MATERIEL AREA&apos;S (AMA) ORGANIC WORKLOAD, AND FEASIBILITY STUDY OF THE AMA&apos;S CAPABILITIES TO ACCOMPLISH THE TASK; CHAPTER 3 SURVEYS  THE DEVELOPMENT OF PROTOTYPES, FUNDING ACTIONS, SIGNIFICANT DATES IN THE PROTOTYPE EFFORT, MODIFICATIONS AND AIRFRAME REQUIREMENTS, EMPHASIS PLACED  ON THE PROJECT BY GEN BECK; TECHNICAL DATA REVIEW, AND COMPETITION WITH PAVE PRONTO PROJECT; CHAPTER 45 EXAMINES LOGISTICAL SUPPORT, ITEM MANAGEMENT  FOR FIRE CONTROL SYSTEM COMPONENTS, AND AC-130E AIRCRAFT PARTS PROCUREMENT. CHAPTER 5 ADDRESSES THE PAVE SPECTRE MANAGEMENT TEAM EFFORT AND MANPOWE,  OVERCOMING A TWO MONTH PRODUCTION DELAY, PROJECT OFFICE FOR THE GUNSHIP, OPERATION FLOW SCHEDULE, AND A CLOSE LOOK AT DETAILS OF PAVE SPECTRE WORK  FORCE; CHAPTER 6 COVERS ENGINEERING ASPECTS OF THE AC-130E AIRCRAFT GUNSHIP DEVELOPMENT. REVIEWS PACKARD&apos;S AC-130 FLIGHT, ACTION BY PRESIDENTIAL  SCIENTIFIC ADVISIORY BOARD, THE KISSENGER MEMOS, DECISION TO PRODUCE THE AC-130E FLEET, THE IN HOUSE CONTRACT, SEARCH FOR A FIRE CONTROL SYSTEM,  STRUCTURAL DESIGN CAPABILITY, PAVE SPECTRE PROJECT SCHEDULING, TESTING OF THE AIRCRAFT, AND ANALYSIS; CHAPTER 7 DISCUSSES LESSONS LEARNED.</ABSTRACT>
 <TITLE_AE>AC-130E AIRCRAFT (GUNSHIP) (PROJECT PAVE SPECTRE:  1970 THROUGH 1971  HISTORICAL STUDY NO. 25  PART IV:  WRAMA&apos;S WEAPONS SYSTEMS  REDESIGNATION OF C-130E AIRCRAFT GUNSHIP TO AC-130E AIRCRAFT DESIGNATION</TITLE_AE>
 <DNOTES>PROJECT CORONA HARVEST NO. CH0275237.</DNOTES>
</dbo_IRIS_RECORDS>
